Preparation & Pre-Installation Inspections
1. Determine Installation Location:
2. Clean Installation Area:
3. Installation Foundation And Support:
4. Pipeline And Electrical Layout:
5. Safety Considerations:

1. Unloading And Transportation:
2. Connect The Piping System:
3. Install Accessories And Control Devices:
4. Adjustment And Calibration:
5. Connect The Power Supply:
1. System Leakage Inspection:
2. Control System Inspection:
3. Operation Test:
4. Performance Evaluation:
